Project Engineer Tovah Kaminsky
Project Engineer
[email protected] | (414) 555-2126 | Milwaukee, United States
Profile
Project engineer with three years of contract administration on healthcare and higher education work, running the RFI and submittal registers on two contracts worth $11.4 million and $18.9 million. Processed 1,180 submittals and 412 requests for information on the clinic fit-out, holding median RFI turnaround to 6 working days against a 10 day contract allowance. Bachelor of Science in construction engineering and management, and a working knowledge of Procore, Bluebeam Revu and Sage 300.
Work Experience
06/2014 - Present, Project Engineer, Third Ward Construction Services, Milwaukee, United States
- Run the RFI and submittal registers on two contracts worth $11.4 million and $18.9 million in healthcare and higher education work.
- Processed 1,180 submittals and 412 requests for information on the clinic fit-out, holding median RFI turnaround to 6 working days against a 10 day contract allowance.
- Maintain the submittal schedule and the long-lead procurement log, flagging 9 packages that would have missed the erection sequence.
- Draft change order backup and assemble cost proposals for the project manager's review; 22 change orders priced to date.
- Collect lien waivers and certified payroll for every monthly application for payment.
05/2013 - 08/2013, Construction Intern, Third Ward Construction Services, Milwaukee, United States
- Assembled closeout documentation and operations and maintenance manuals for a $6.8 million school addition.
- Logged and distributed shop drawings against the approved submittal schedule.
Education
08/2010 - 05/2014, Bachelor of Science, Construction Engineering and Management, University of Wisconsin-Platteville, Platteville, United States
Coursework in construction contracts and law, estimating, project controls and structural systems. Capstone on submittal cycle time and its effect on procurement float.
Skills
RFI log ownership and tracking, 85
Submittal register and submittal schedule, 85
Change order backup and cost proposals, 70
Lien waiver and certified payroll collection, 80
Procore, 85
Bluebeam Revu, 85
Sage 300 Construction and Real Estate, 65
Languages
English, native
Polish, intermediate
Certificates
03/2015, OSHA 30-hour Construction Outreach, Occupational Safety and Health Administration Outreach Training Program
Course completion card. OSHA states an Outreach card is not a certification or license.
02/2015, First Aid and CPR, American Red Cross
Summary
A construction project manager resume is a one to two page document about the contract: the requests for information you cleared, the submittals you moved, the change orders you priced and what they were worth. This guide gives you three adaptable versions, the volume table almost nobody includes, and current Bureau of Labor Statistics pay and outlook.
Construction Project Manager resume examples by experience level
In short, a construction project manager resume is a one to two page document about the contract: the requests for information you cleared, the submittals you moved, the change orders you priced, and what all of it cost.
That is the job, and it is worth being blunt about the boundary. First, the superintendent owns means and methods in the field: the sequence, the crews, the daily report, the inspections. The project manager, on the other hand, owns the contract and the money: buyout, the schedule of values, the submittal register, the RFI log, change order pricing and the monthly application for payment. In other words, two people, one job site, two entirely different resumes. That is why a resume that blurs them reads as someone who has done neither.
Resume guide for a construction project manager resume
Therefore, this guide and the corresponding construction project manager resume example will cover:
- First, how to write a construction project manager resume, section by section
- Then, why RFI, submittal and change order volumes belong on the page
- Also, three adaptable summaries: project engineer, project manager and senior project manager
- What AIA A201 actually says a change order is, and why that matters to your bullets
- Finally, what the job market looks like and what you can expect to earn
How to write a construction project manager resume
Overall, six sections: contact header, summary, a project volumes table, experience, education and credentials, and a systems block. One page for your first five years, two once you are carrying more than one contract at a time.
The volumes table sits directly under the summary because it is the only part of the page a reader cannot get anywhere else. Everyone writes "managed all phases of construction." However, almost nobody writes "412 RFIs at a median six day turnaround."
| Section | What it is answering | Where it goes |
|---|---|---|
| Volumes table | How much contract administration has this person actually processed? | Directly under the summary |
| Experience | What did they own on the money, and what did it move? | Reverse chronological, with dollars |
| Credentials | PMP, CCM, or a state license the owner asks about | Its own block, with numbers |
| Systems | Which project management and accounting platforms do they already run? | Named by product |
Write your bullets in the contract’s own vocabulary
AIA Document A201-2017 defines a Change Order as "a written instrument prepared by the Architect and signed by the Owner, Contractor, and Architect" agreeing on the change in the Work, the amount of the adjustment in the Contract Sum, and the extent of the adjustment in the Contract Time (AIA Contract Documents, A201-2017 Section 7.2.1, retrieved 17 September 2026).
It separately defines a Construction Change Directive as "a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work prior to agreement on adjustment" in the Contract Sum or Contract Time (Section 7.3.1, same source).
Those are two different instruments, and a project manager who has worked under a construction change directive has priced work while the number was still open. If you have, say so in those words. A reader who administers contracts for a living will notice immediately, and it is not a phrase anyone uses by accident.
Run the finished file through the free Rezoom ATS resume checker before you submit it. Contractor applicant systems parse these before a person opens them.
Choosing the best resume format for a construction project manager resume
In short, reverse chronological, with the volumes table above it. In general, one page for your first five years, two once you are carrying concurrent contracts or a portfolio with a combined value worth stating.
However, functional formats fail here for a specific reason: contract administration experience is cumulative and tied to particular jobs. Anyone can open an RFI. In particular, closing one out, incorporating the answer, and getting the resulting cost impact into a signed change order is the part that takes a year to learn, and it only shows in a timeline.
Include your contact information
| ✅ Right | ❌ Wrong |
|---|---|
| Tovah Kaminsky, PMP | Tovah Kaminsky |
| Construction Project Manager, Healthcare and Higher Education, $10M to $40M contracts | Experienced construction professional and team player |
| PMP #3184922, Project Management Institute | PMP certified |
| (414) 555-2126, [email protected], Milwaukee, WI | (414) 555-2126, [email protected] |
To begin with, put the contract value band in the line under your name. That is the single fastest way to tell a reader whether you are a fit, and it costs one line.
Make use of a summary
Specifically, four lines: your role, your years, the contract band you administer, and one volume or dollar figure that came out of a real job.
Project engineer with three years of contract administration on healthcare and higher education work, running the RFI and submittal registers on two contracts worth $11.4 million and $18.9 million. Processed 1,180 submittals and 412 requests for information on the clinic fit-out, holding median RFI turnaround to 6 working days against a 10 day contract allowance. Bachelor of Science in construction engineering and management, and a working knowledge of Procore, Bluebeam Revu and Sage 300.
Construction project manager with nine years administering healthcare and higher education contracts from $10 million to $38.6 million. On the last four contracts I closed 1,461 requests for information at a median 5 working day turnaround and priced 112 change orders worth a net $2.9 million, settling all of them without a claim. Project Management Professional, credential #3184922, and I own buyout, the schedule of values and the monthly application for payment on every job I run.
Senior project manager carrying three concurrent contracts worth $71 million with two project managers and two project engineers reporting in. Rebuilt the submittal register and approval workflow across the division, which cut median submittal cycle time from 21 days to 12 and removed 38 late-delivery back charges in the first year. Project Management Professional and Certified Construction Manager, and I run the buyout and change order pricing review for every contract the division signs.
Right vs wrong: the same construction project manager summary, twice
| ✅ Right | ❌ Wrong |
|---|---|
| Nine years administering healthcare and higher education contracts from $10 million to $38.6 million. | Extensive experience managing construction projects of all types and sizes. |
| Closed 1,461 requests for information at a median 5 working day turnaround. | Excellent communicator who works well with architects and subcontractors. |
| Priced 112 change orders worth a net $2.9 million and settled all of them without a claim. | Skilled at managing project changes and resolving issues as they arise. |
The right column is a record. The left column, by contrast, is a job description, and every applicant has the same one.
Outline your experience
Then list the contractor, city, your title, the market sector, and dates. Then three to five bullets. Every bullet carries a count, a cycle time or a dollar figure, and every bullet is about the contract rather than the field.
| Instead of | Use |
|---|---|
| Managed RFIs and submittals | Closed 412 requests for information at a median 6 working day turnaround against a 10 day contract allowance |
| Processed change orders | Priced 34 change orders worth a net $1.24 million, 3.2% of a $38.6 million contract, all settled without a claim |
| Handled project buyout | Bought out 27 subcontracts and 9 material packages against a $38.6 million contract, $1.1 million under the estimate |
| Prepared monthly billing | Built a 214-line schedule of values and ran 26 applications for payment with no rejected pay application |
| Used project management software | Administer Procore for submittals, RFIs and daily logs, with cost data reconciling nightly to Sage 300 |
Construction Project Manager, Lakeshore Terminal Builders, Milwaukee, WI, June 2018 to February 2023
Administered four healthcare and higher education contracts from $10.2 million to $38.6 million, owning buyout, the schedule of values, the submittal register, the RFI log, change order pricing and the monthly application for payment on each.
Closed 1,461 requests for information across the four contracts at a median 5 working day turnaround, and tracked every one through to the drawing revision or change order it produced.
Priced 112 change orders worth a net $2.9 million and settled all of them without a claim, including 14 originating as construction change directives where the work started before the number was agreed.
Bought out 27 subcontracts and 9 material packages on the $38.6 million hospital fit-out, closing $1.1 million under the preconstruction estimate.
Built a 214-line schedule of values that mapped one to one onto the cost code structure, which let job cost reporting reconcile to billing without manual entry.
Put your RFI, submittal and change-order volumes on the page
In fact, this is the block almost nobody includes, and on a project manager's resume it is the whole argument.
Contract administration is measurable work. In other words, it has counts, cycle times, and a dollar value attached to the changes. In practice, a project manager who can produce those numbers has kept a real log; one who cannot has probably not been the person holding the pen.
| Contract | Value | RFIs, median turnaround | Submittals | Change orders | Net change | |---|---|---|---|---|---| | Hospital surgical suite fit-out | $38.6M | 412, 6 days | 1,180 | 34 | +$1.24M, 3.2% | | University laboratory renovation | $22.4M | 508, 4 days | 940 | 41 | +$780K, 3.5% | | Outpatient clinic, new build | $18.9M | 318, 5 days | 655 | 22 | +$612K, 3.2% | | Student housing renovation | $10.2M | 223, 5 days | 402 | 15 | +$268K, 2.6% |
RFI count and turnaround. AIA A201-2017 obliges the Contractor to "promptly report to the Architect any errors, inconsistencies or omissions discovered" in the Contract Documents, and obliges the Architect to "review and respond to requests for information about the Contract Documents" (AIA Contract Documents, A201-2017 Sections 3.2.4 and 4.2.14, retrieved 17 September 2026). ConsensusDocs publishes a standard form for the same transaction, ConsensusDocs 790, described as an RFI and response form "used to formally request clarification or direction" on a construction project (ConsensusDocs, retrieved 17 September 2026). Turnaround is the number worth writing, because it is the one thing in the log you can influence: a clear, single-question RFI with a proposed answer comes back faster than a vague one.
Submittal count. A201-2017 distinguishes Shop Drawings, which are "specially prepared for the Work by the Contractor or a Subcontractor," from Product Data and from Samples, which are "physical examples that illustrate materials, equipment, or workmanship" (Sections 3.12.1 to 3.12.3, same source). It also requires the Contractor to review, approve and submit them "in accordance with the submittal schedule approved by the Architect," and requires that schedule to allow the Architect "reasonable time to review submittals" (Sections 3.12.5 and 3.10.2). If you built the submittal schedule rather than inheriting it, that is a sentence worth having.
Change order count, net value and percentage. Write all three. A count says nothing about size; a dollar figure says nothing about the contract it sat on. The percentage of contract value is what a reader will calculate anyway, so give it to them, and say how the changes were settled.
What not to put in this table. Crew headcount, trades on site, inspection pass rates and daily report counts belong to the superintendent's resume, not yours. Putting them here suggests you are unclear about which job you are applying for, and on a well-run project those two people are not interchangeable.
Build a snapshot of your key skills
Specifically, twelve to sixteen entries in four groups: contract administration, cost, schedule, and the systems you administer.
Contract administration: RFI log ownership, Submittal register and submittal schedule, Change order pricing and negotiation, Construction change directive administration, Subcontract scope writing and exhibits
Cost: Buyout and bid leveling, Cost code structure, Schedule of values development, Applications for payment and lien waiver collection, Contingency and allowance reconciliation, Job cost forecasting
Schedule: Cost-loaded CPM scheduling, Look-ahead coordination with the superintendent, Time impact analysis, Long-lead procurement tracking
Systems: Procore, Autodesk Build, Bluebeam Revu, Primavera P6, Sage 300 Construction and Real Estate, Textura
List your education and certifications
Degree, then certifications with credential numbers and dates, then the safety card.
In addition, two credentials come up repeatedly in this role, and they are not interchangeable.
The Project Management Professional, issued by the Project Management Institute, requires three years of experience managing projects with a bachelor's degree or higher, or five years with a high school diploma, plus 35 hours of project management training or an active CAPM certification. The exam is 180 questions in 240 minutes, and holders renew by earning 60 professional development units in each three-year cycle (Project Management Institute, retrieved 17 September 2026). It is a general project management credential, not a construction one, which is both its strength and its limit.
The Certified Construction Manager, issued by the Construction Management Association of America, is accredited by the ANSI National Accreditation Board to ISO 17024 and requires 48 non-overlapping months of experience as the responsible-in-charge construction manager on top of a qualifying degree. Its exam presents 175 questions of which 150 are scored, allows 240 minutes and requires 72 percent to pass, and CCMs recertify every three years with at least 25 points of professional development (Construction Management Association of America, retrieved 17 September 2026).
Neither is a license. The Bureau of Labor Statistics notes that some states require construction managers to be licensed and points candidates to their state licensing board, while describing professional certification as not required but a demonstration of knowledge and experience (BLS Occupational Outlook Handbook, published 27 August 2026).
Project Management Professional, Project Management Institute, #3184922, awarded June 2019, renewed June 2025
Certified Construction Manager, Construction Management Association of America, #CCM-214077, awarded September 2023
Bachelor of Science, Construction Engineering and Management, University of Wisconsin-Platteville, Platteville, WI, 2014
OSHA 30-hour Construction Outreach card, issued 2015. OSHA states that an Outreach card "is not considered a certification or license" (OSHA Outreach Training Program, retrieved 17 September 2026).
Choose the right layout and design
Above all, single column, plain type at 11 or 12 point, clear headings, no photograph. The volumes table is the one element that should be a real ruled table, because that is how it gets read at a glance.
Put the volumes table above the experience block. Give RFI counts with a median turnaround, not just a count. Give change orders as count, net dollars and percentage of contract value. Say how changes were settled, including any construction change directives. Name the accounting system as well as the project management system, because they are different jobs. State your contract value band in the header line.
Do not claim field metrics that belong to the superintendent, such as crew headcount or inspections passed. Do not write "managed all phases of construction", which describes no one. Do not report a change order percentage without the contract value it sits on. Do not describe the PMP or CCM as a license. Do not use a two-column template; contractor portals parse these before a person reads them.
Construction project manager job market and outlook
However, the Bureau of Labor Statistics publishes no separate Occupational Outlook Handbook profile for construction project managers. Instead, the closest published occupation, and the one these figures come from, is construction managers.
| Measure | Value |
|---|---|
| Construction manager jobs, 2025 | 609,100 |
| Projected change, 2025-35 | 9% (much faster than average), +55,200 |
| Projected annual openings | ~49,700 |
| Typical entry-level education | Bachelor's degree |
| Median annual wage, May 2025 | $114,990 ($55.28 an hour) |
Source: U.S. Bureau of Labor Statistics, Occupational Outlook Handbook, 2025-35 projections and May 2025 wage data, published 27 August 2026.
Sector explains more of the pay than the job title does
Within construction managers, median annual pay ranges from $98,390 in residential building construction to $126,690 in nonresidential building construction, with heavy and civil engineering construction at $124,430 and specialty trade contractors at $104,100 (BLS Occupational Outlook Handbook, May 2025 data, published 27 August 2026).
The employment shares explain why the reading matters: self-employed workers are 38 percent of the occupation, specialty trade contractors 17 percent, nonresidential building construction 15 percent, residential building construction 9 percent and heavy and civil engineering construction 8 percent (same source).
For a project manager specifically, that spread is largely a proxy for contract size and contract complexity. A $38.6 million hospital fit-out generates a submittal register and a change order log that a $2 million residential project never will, and the volumes table is the shortest way to prove you have administered one.
Where the jobs sit:
| Setting | Share of employment | Median annual wage (May 2025) |
|---|---|---|
| Self-employed | 38% | Not separately published |
| Specialty trade contractors | 17% | $104,100 |
| Nonresidential building construction | 15% | $126,690 |
| Residential building construction | 9% | $98,390 |
| Heavy and civil engineering construction | 8% | $124,430 |
Source: U.S. Bureau of Labor Statistics, Occupational Outlook Handbook, May 2025 data, published 27 August 2026.
What salary you can expect as a construction project manager
Because BLS publishes no separate profile for the title, the usable figure is the construction managers median: $114,990 a year, or $55.28 an hour, as of May 2025. The lowest 10 percent earned less than $69,690 and the highest 10 percent more than $189,440 (BLS Occupational Outlook Handbook, published 27 August 2026).
Even so, the part of that spread a project manager's resume can move is contract size. That is because firms set project manager pay bands against the value and complexity of the contracts a person can be handed, and the interview will get there in the first fifteen minutes. A candidate who arrives with a table showing four contracts from $10.2 million to $38.6 million has answered the question before it is asked, and has anchored the band at the top of their range rather than the bottom.
The second lever is settlement history. A project manager who has priced 112 change orders and settled all of them without a claim has saved a firm legal cost that is real but invisible, and it is worth stating plainly because nobody else does.
BLS also notes that construction managers may need to work extra hours to meet deadlines and may be on call 24 hours a day to respond to project emergencies (same source). Also, pay packages here usually include a vehicle allowance and a completion bonus tied to the contract's final margin.
Key takeaways for a construction project manager resume
- First, put a volumes table above the experience block: RFIs, submittals, change orders, cycle times.
- Give RFI counts with a median turnaround, because turnaround is the part you controlled.
- Then write change orders as count, net dollars and percentage of contract value.
- Also, use the contract's own vocabulary, including construction change directives if you have run them.
- Finally, stay on your side of the line: field metrics belong to the superintendent's resume.
- Name the accounting platform as well as the project management platform.
- Put your contract value band in the header line, since that is what sets the pay band.
Build your construction project manager resume in 15 minutes with our AI resume builder.
Related construction resume examples
- Construction manager resume
- Construction superintendent resume
- Contractor resume
- Construction resume
- Construction worker resume
- General laborer resume
- Carpenter resume
- Electrician resume
- Plumber resume
- Glazier resume
- Facilities manager resume
- Operations manager resume
Pair it with a matching construction project manager cover letter.
Construction project manager resume questions, answered
How long should a construction project manager resume be?
One page for your first five years as a project engineer and project manager. Two pages once you are carrying concurrent contracts and the volumes table has four or more rows worth showing. Never three. If the table is what pushes you over, cut the oldest contract rather than shrinking the type.
What is the difference between a construction project manager and a superintendent?
The project manager owns the contract and the money: buyout, the schedule of values, the submittal register, the RFI log, change order pricing and the monthly application for payment. The superintendent owns means and methods in the field: sequence, crews, the daily report, inspections and safety on the deck. They share a job site and a look-ahead schedule, and almost nothing else. Write for the one you are applying to.
Do I really need to list RFI and submittal counts?
You need something countable, and those are the countable things this job produces. If your firm did not keep clean numbers, use what you can stand behind: the number of subcontracts you bought out, the line count of the schedule of values you built, the number of applications for payment you ran, the value of changes you priced. A defensible smaller number beats a large one you cannot source.
Is the PMP worth getting for construction?
It depends on the owner. The PMP requires three years of project management experience with a bachelor's degree, or five years with a high school diploma, plus 35 hours of training, and is renewed with 60 professional development units every three years (Project Management Institute, retrieved 17 September 2026). Institutional and corporate owners often list it. If you work for general contractors on building work, the Certified Construction Manager is more often asked for by name.
How do I write a contract that went badly?
Write what you did about it. A construction change directive you priced and closed, a claim you settled in mediation, a defaulted subcontractor you re-bid, a schedule of values you rebuilt after a rejected pay application. Everyone reading has had a contract go sideways, and a project manager who can narrate a recovery in numbers reads as more experienced than one whose every job apparently ran clean.