Assistant Construction Manager Renzo Delahoussaye

Assistant Construction Manager

[email protected] | (225) 555-2116 | Baton Rouge, United States

Profile

Assistant construction manager with three years on nonresidential building work in south Louisiana, supporting two design-bid-build projects worth $14.2 million and $9.8 million through buyout, construction and closeout. Ran the submittal log and the owner allowance tracker on both, and closed the library project with 11 of 12 allowances unspent. Hold a bachelor's degree in construction management and an OSHA 30-hour construction card.

Work Experience

09/2013 - Present, Assistant Construction Manager, Perique Constructors, Baton Rouge, United States

  • Assist on two design-bid-build public projects: a $14.2 million, 38,000 square foot parish library replacement and a $9.8 million, 21,000 square foot hardened emergency operations center.
  • Own the submittal log on both jobs, 640 submittals to date, and hold the average architect turnaround at 9 working days against a 14 day contract allowance.
  • Run the owner allowance tracker; the library closed with 11 of 12 allowances unspent and $186,000 returned.
  • Assemble the closeout binder, as-built set and operations and maintenance manuals for the library turnover.

06/2012 - 08/2013, Field Engineer, Perique Constructors, Baton Rouge, United States

  • Laid out and verified concrete and structural steel work on a 21,000 square foot emergency operations center.
  • Kept the daily quantity record for self-performed concrete placements, 4,100 cubic yards across the job.

Education

08/2008 - 05/2012, Bachelor of Science, Construction Management, Louisiana State University, Baton Rouge, United States

Coursework in estimating, scheduling, construction law and mechanical and electrical systems. Senior capstone on guaranteed maximum price conversion.

Skills

Submittal and RFI log administration, 80

Quantity takeoff and field measurement, 75

Allowance and unit price tracking, 70

Closeout documentation and as-builts, 80

Procore, 75

Bluebeam Revu, 80

Microsoft Project, 65

Languages

English, native

French, intermediate

Certificates

04/2013, OSHA 30-hour Construction Outreach, Occupational Safety and Health Administration Outreach Training Program

Course completion card. Not a certification or license.

02/2013, First Aid and CPR, American Red Cross

Summary

A construction manager resume is a one to two page document that names the projects you have delivered, the contract model each one ran under, and what each was worth. This guide gives you three adaptable versions, the project table that most applicants leave out, and current Bureau of Labor Statistics pay and outlook for the occupation.

Construction Manager resume examples by experience level

In short, a construction manager resume is a one to two page document that names the projects you have delivered, the delivery method each one ran under, and what each was worth.

However, that middle item is where most applicants lose the job. For example, a construction manager who has only ever run hard-bid public work has not done the same job as one who has sat at a design-build table pricing a scope that did not exist yet. Both are construction managers. As a result, neither can be hired for the other's backlog on the strength of a resume that says "managed commercial construction projects."

Resume guide for a construction manager resume

For that reason, this guide and the corresponding construction manager resume example will cover:

  • First, how to write a construction manager resume, section by section
  • Then, why a project table belongs on the page, and what four columns it needs
  • Also, three adaptable summaries: assistant, manager and senior manager
  • What the CCM and CPC credentials actually require, and how to write them
  • Finally, what the job market looks like and what you can expect to earn

How to write a construction manager resume

Overall, six sections: contact header, summary, project table, experience, education and credentials, and skills. Generally, one page for your first five years, two once your project table is the reason a hiring team reads you.

Above all, the project table goes above the experience block, not inside it. After all, a hiring team reads a construction manager's file to answer one question first: has this person delivered something the size and shape of what we have coming.

SectionWhat it is answeringWhere it goes
Project tableHave they delivered our kind of work, at our size, under our contract model?Directly under the summary
ExperienceWhat did they own, and what did it cost or save?Reverse chronological, with numbers
CredentialsDo they hold a certification our owner or our insurer asks about?Its own block, with numbers and dates
SkillsWhich estimating, scheduling and project systems do they already run?Grouped, not a single list
Expert Tip

Name the delivery method on every project, because it is a different job each time

The Federal Highway Administration describes design-build as an approach in which "one entity performs both architectural/engineering and construction under one single contract," against the traditional design-bid-build approach, in which the contracting agency designs the work or procures the design separately and then "separately contracts for at-risk construction by engaging a contractor through competitive bidding" (Federal Highway Administration, retrieved 17 September 2026).

Those two sentences describe two different working lives. On design-bid-build you inherit a finished set of documents and your skill is in bidding, buying out and administering them. On design-build you are priced in before the design is finished and your skill is in holding a budget while the drawings move underneath it. CM at risk is a third thing again: you are an advisor during design, and then you convert to a guaranteed maximum price and carry the risk you just helped write.

A resume that does not say which of those three you ran is asking the reader to guess, and readers guess low.

Run the finished file through the free Rezoom ATS resume checker before you submit it. Most general contractors and owner's representatives parse applications into a system before a person opens them.

Choosing the best resume format for a construction manager resume

Again, reverse chronological, with a project table sitting above it. One page for your first five years, two once you have carried a guaranteed maximum price or run more than one project at a time.

In contrast, functional and skills-based formats fail badly here. A reader wants to trace continuity: which contractor, which market sector, which projects, how long, and whether you stayed through closeout. Indeed, a format that hides the timeline reads as a timeline worth hiding.

Include your contact information

✅ Right❌ Wrong
Renzo Delahoussaye, CCMRenzo Delahoussaye
Construction Manager, Healthcare and Municipal, CM at Risk and Design-BuildDynamic construction professional with a proven track record
CCM #CCM-208814, Construction Management Association of AmericaCertified construction manager
(225) 555-2116, [email protected], Baton Rouge, LA(225) 555-2116, [email protected]

Therefore, put the market sectors and the contract models in the line under your name. That is the fastest way to tell a reader whether to keep going, and it costs you nothing.

Make use of a summary

Four lines: your sector, your years, the contract value you have carried, and one number that came out of a job rather than out of a job description.

Assistant construction manager adaptable resume summary example

Assistant construction manager with three years on nonresidential building work in south Louisiana, supporting two design-bid-build projects worth $14.2 million and $9.8 million through buyout, construction and closeout. Ran the submittal log and the owner allowance tracker on both, and closed the library project with 11 of 12 allowances unspent. Hold a bachelor's degree in construction management and an OSHA 30-hour construction card.

Construction manager adaptable resume summary example

Construction manager with nine years delivering healthcare, municipal and distribution work across three delivery methods, with a completed project table running from $9.8 million to $61.4 million. Converted a hospital bed tower from preconstruction advice to a $61.4 million guaranteed maximum price and delivered it 12 days ahead of the contract date with $412,000 of unused contingency returned to the owner. Certified Construction Manager, credential #CCM-208814.

Senior construction manager adaptable resume summary example

Senior construction manager carrying a $148 million active portfolio across four concurrent projects, two of them progressive design-build. Built the delivery-method screening process the firm now uses to decide which pursuits to price, which lifted the design-build win rate from 1 in 7 to 1 in 3 over two years. Certified Construction Manager and Certified Professional Constructor, and run the preconstruction handoff for every job the firm takes.

Right vs wrong: the same construction manager summary, twice

✅ Right❌ Wrong
Nine years delivering healthcare, municipal and distribution work across three delivery methods.Extensive experience managing a wide variety of construction projects.
A completed project table running from $9.8 million to $61.4 million.Managed projects of all sizes from small renovations to large builds.
Converted a bed tower to a $61.4 million guaranteed maximum price and returned $412,000 of contingency.Consistently delivered projects on time and within budget.

On the other hand, a firm can match the right column against a backlog. The left column cannot, even though a firm reading forty files against three upcoming jobs is matching.

Outline your experience

Next, list the contractor, city, your title, the sector, and dates. Then three to five bullets. Specifically, every bullet carries a dollar figure, a day count, a square footage or a percentage, and it says what you personally owned.

Instead ofUse
Managed construction projects from start to finishRan a 104,000 square foot hospital bed tower from preconstruction through closeout under a $61.4 million guaranteed maximum price
Coordinated with subcontractorsBought out 31 subcontracts against a $61.4 million GMP and finished buyout $1.9 million under the estimate
Responsible for project budgetsReturned $412,000 of unused contingency to the owner at final reconciliation
Worked with owners and design teamsSat the owner, architect and contractor meeting weekly for 26 months and carried the open-items log
Ensured projects were completed on scheduleDelivered 12 days ahead of the contract completion date on a 26-month schedule
Adaptable resume employment history example

Construction Manager, Pelican Reach Builders, Baton Rouge, LA, March 2015 to January 2021

Delivered nonresidential building and municipal work under design-bid-build, CM at risk and progressive design-build, with individual contract values from $9.8 million to $61.4 million.

Converted a 104,000 square foot hospital bed tower from preconstruction advice to a $61.4 million guaranteed maximum price, then delivered it 12 days early and returned $412,000 of unused contingency at reconciliation.

Bought out 31 subcontracts on that project and closed buyout $1.9 million under the preconstruction estimate, which funded the owner's alternate for the rooftop mechanical screen.

Self-performed concrete and rough carpentry on three of the six projects, running a peak in-house crew of 22 alongside the subcontracted trades.

Carried the owner, architect and contractor meeting, the open-items log and the monthly cost report on every project in the table.

Write your project list as a table, with delivery method and contract value

Even so, this is the block almost nobody includes, and it is the one that puts your file in the right stack.

In other words, a construction manager's resume is a portfolio document. The prose can say you are organized and decisive; a table says what you have actually built. In practice, five columns: the project, the delivery method, the contract value, the scale, and what your own forces self-performed.

Adaptable resume project table example

| Project | Delivery method | Contract value | Scale | Self-performed | |---|---|---|---|---| | Regional medical center bed tower | CM at risk, GMP | $61.4M | 104,000 sq ft, 5 floors, occupied campus | Concrete, rough carpentry | | Municipal water treatment expansion | Progressive design-build | $28.9M | 12 MGD capacity | Sitework, yard piping | | Regional distribution center | Design-build | $22.6M | 310,000 sq ft shell and site | Sitework | | Parish library replacement | Design-bid-build | $14.2M | 38,000 sq ft | None, fully subcontracted | | Parish emergency operations center | Design-bid-build | $9.8M | 21,000 sq ft, hardened | None, fully subcontracted |

Delivery method tells them which version of the job you have done. Design-bid-build is administration of a finished document set. Design-build puts you inside the design decision, and the Federal Highway Administration's own framing is that the design-builder carries responsibility for design documents being complete and free from error, which is a risk a design-bid-build contractor never holds (Federal Highway Administration, retrieved 17 September 2026). CM at risk is preconstruction advice followed by a guaranteed maximum price.

Contract value, scale and self-perform work

Contract value is the number the reader is really screening on. A firm whose next three jobs are in the $30 million to $70 million band will not shortlist someone whose largest completed project is $6 million, however good the bullets are. Write the value of the contract you administered, not the value of the whole campus program you were adjacent to.

Scale is the second screen, because value and size come apart. A 310,000 square foot distribution shell at $22.6 million and a 104,000 square foot hospital floor at $61.4 million are different problems, and square footage is what says which one you solved.

Self-perform is the column almost everyone drops, and it changes the reading of everything above it. A manager who has directly employed and scheduled a concrete crew has carried labor productivity, equipment and a payroll. One who has only administered subcontracts has not. Neither is better; different firms simply hire them.

Keep the table honest. If you were the assistant, say assistant in a sixth column. A table that overstates your role is the easiest thing in this industry to check, because everyone on a project remembers who ran it.

Build a snapshot of your key skills

In brief, twelve to sixteen entries in four groups: preconstruction, project controls, the field, and the systems you run.

Adaptable resume skills example

Preconstruction: Conceptual estimating, Guaranteed maximum price conversion, Subcontractor prequalification, Bid leveling and scope comparison, Value engineering logs

Project controls: Cost-loaded CPM scheduling, Cost code structure and job cost reporting, Contingency and allowance management, Buyout tracking, Monthly owner cost reporting

Field and delivery: Self-perform concrete and carpentry, Subcontract administration, Quality control programs, Commissioning and turnover, Punch list and closeout

Systems: Procore, Primavera P6, Microsoft Project, Bluebeam Revu, Sage 300 Construction and Real Estate, On-Screen Takeoff

List your education and certifications

Degree, then certifications with their credential numbers and dates, then the safety cards.

Two credentials are worth understanding properly before you write either one.

The Certified Construction Manager, issued by the Construction Management Association of America, is accredited by the ANSI National Accreditation Board under the International Organization for Standardization's 17024 standard (Construction Management Association of America, retrieved 17 September 2026). Its core requirement is 48 non-overlapping months of experience as the responsible-in-charge construction manager, on top of a qualifying degree; without a degree the requirement becomes 8 years of general construction or design experience plus the same 48 months responsible-in-charge. The exam presents 175 questions and scores 150 of them, allows 240 minutes, and requires 72 percent to pass. CCMs recertify every three years with a minimum of 25 points of professional development, or by sitting the exam again (Construction Management Association of America, retrieved 17 September 2026).

The Certified Professional Constructor, issued by the American Institute of Constructors, is the second level of a two-level program. It requires that you have passed or been exempted from the Level 1 Certified Associate Constructor exam, plus four further years of acceptable professional experience, of which a minimum of two years must be managing the execution of construction work. The Level 2 exam is 175 multiple-choice questions in a single four-hour session (American Institute of Constructors, retrieved 17 September 2026).

Similarly, both are worth listing with the credential number. Neither is a license, and neither substitutes for one: the Bureau of Labor Statistics notes that some states require construction managers to be licensed and directs candidates to their state licensing board, while describing professional certification as not required but a demonstration of knowledge and experience (BLS Occupational Outlook Handbook, published 27 August 2026).

Adaptable resume education and certifications example

Certified Construction Manager, Construction Management Association of America, #CCM-208814, awarded March 2021, recertified March 2024

Certified Professional Constructor, American Institute of Constructors, Level 2, awarded October 2023

Bachelor of Science, Construction Management, Louisiana State University, Baton Rouge, LA, 2012

OSHA 30-hour Construction Outreach card, issued 2013. First aid and CPR, American Red Cross, 2026.

Choose the right layout and design

In summary, single column, plain type at 11 or 12 point, clear headings, no photograph. However, the one place you break from a plain paragraph layout is the project table, which should be a real table with ruled columns.

Do

Put the project table above the experience block. Name the delivery method on every single project. Give the contract value you administered, in dollars, and the scale in square feet or capacity. Say what your own forces self-performed, and say "none" when the answer is none. Write the credential number next to the certification. Keep the sector words visible in the header line, because that is what a reader screens on first.

Iconly/Bold/Close Square Don’t

Do not write "various commercial projects" when the specific list is the whole point of the page. Do not inflate a contract value by claiming a program you were adjacent to. Do not describe yourself as results-driven or detail-oriented, because every other file in the stack does. Do not use a two-column template; contractor applicant systems parse these before a person reads them. Do not pad to two pages before your project table has earned the second one.

Construction manager job market and outlook

A large occupation growing much faster than average, with a third of it self-employed and a wide pay spread by sector.

MeasureValue
Construction manager jobs, 2025609,100
Projected change, 2025-359% (much faster than average), +55,200
Projected annual openings~49,700
Typical entry-level educationBachelor's degree
Median annual wage, May 2025$114,990 ($55.28 an hour)

Source: U.S. Bureau of Labor Statistics, Occupational Outlook Handbook, 2025-35 projections as well as May 2025 wage data, published 27 August 2026.

Statistical insight

Thirty-eight percent of the occupation is self-employed, and that is what the project table is for

Self-employed workers are the single largest share of construction managers at 38 percent, ahead of specialty trade contractors at 17 percent, nonresidential building construction at 15 percent, residential building construction at 9 percent and heavy and civil engineering construction at 8 percent (BLS Occupational Outlook Handbook, May 2025 data, published 27 August 2026).

That matters for how you write. In an occupation where nearly four in ten people are working for themselves, a great many resumes arrive with no recognizable employer name on them at all. The reader cannot calibrate you against a firm they know, so the project table does the calibrating instead: value, scale, delivery method, sector.

It is also why the sector line in your header is doing real work. Median pay ranges from $98,390 in residential building construction to $126,690 in nonresidential building construction, with heavy and civil engineering construction at $124,430 and specialty trade contractors at $104,100 (same source). Those are four different hiring markets, and the resume that does not name which one it comes from gets sorted into the cheapest reading of itself.

Where the jobs sit:

SettingShare of employmentMedian annual wage (May 2025)
Self-employed38%Not separately published
Specialty trade contractors17%$104,100
Nonresidential building construction15%$126,690
Residential building construction9%$98,390
Heavy and civil engineering construction8%$124,430

Source: U.S. Bureau of Labor Statistics, Occupational Outlook Handbook, May 2025 data, published 27 August 2026.

What salary you can expect as a construction manager

To begin with, the median annual wage for construction managers was $114,990 as of May 2025, which is $55.28 an hour. The lowest 10 percent earned less than $69,690 and the highest 10 percent more than $189,440 (BLS Occupational Outlook Handbook, published 27 August 2026).

Moreover, that spread of roughly $120,000 between the deciles is unusually wide, and three things explain most of it.

In particular, the first is sector: the $28,300 gap between the residential and nonresidential building medians is larger than most people's negotiating range, and it is settled before you sit down. The second is contract value, because the firms at the top of the range hire on evidence that you have held numbers of that size. The third is the risk model, since someone who has converted a project to a guaranteed maximum price and delivered inside it has shown something a design-bid-build administrator has not had the chance to.

Still, none of the three is visible on a resume that describes duties. By comparison, all three are visible in a five-column project table.

BLS also notes that construction managers may need to work extra hours to meet deadlines and may be on call 24 hours a day to respond to project emergencies (BLS Occupational Outlook Handbook, published 27 August 2026). Meanwhile, pay conversations here are usually about the whole package: vehicle allowance, per diem on travel jobs, and a completion bonus tied to the job you close.

Key takeaways for a construction manager resume

  1. First, put a project table above the experience block; it is the fastest answer to the only question the reader has.
  2. Name the delivery method on every project, because design-bid-build, design-build and CM at risk are three different jobs.
  3. Give the contract value you administered, in dollars, and the scale in square feet or capacity.
  4. Also, include a self-perform column, and write "none" honestly when that is the answer.
  5. Put your sector words in the header line, because sector explains most of the pay spread.
  6. List credential numbers for the CCM or CPC, and do not call either one a license.
  7. Keep it single column and parseable, since contractor portals read it before a person does.

Build your construction manager resume in 15 minutes with our AI resume builder.

Related construction resume examples

Pair it with a matching construction manager cover letter.

Construction manager resume questions, answered

How long should a construction manager resume be?

One page for your first five years. Two pages once your project table is long enough to be the reason someone is reading, which for most people is after they have carried a guaranteed maximum price or run concurrent jobs. Never three. If the table is pushing you over two pages, cut the oldest projects rather than shrinking the type.

Should I list every project I have worked on?

No. List the projects you managed or assisted on directly, and cap the table at six to eight. Choose them to show range across delivery method and contract value rather than to show volume. A table of five projects spanning design-bid-build, design-build and CM at risk from $9.8 million to $61.4 million says more than fifteen similar jobs.

What do I put on a construction manager resume with no management experience yet?

Write the assistant and field engineer work as the job it was: the project, its value, its delivery method, and the specific logs you owned. Submittal log, RFI log, allowance tracker, as-built set, closeout binder. Those are real deliverables with countable outputs, and a firm hiring an assistant construction manager is hiring someone to own exactly those.

Is the CCM worth getting?

It depends on your owners. The Certified Construction Manager is accredited by the ANSI National Accreditation Board to ISO 17024 and requires 48 non-overlapping months as the responsible-in-charge manager (Construction Management Association of America, retrieved 17 September 2026), and some public owners and program managers ask for it by name in a request for qualifications. BLS describes professional certification for construction managers as not required but a demonstration of knowledge and experience (BLS Occupational Outlook Handbook, published 27 August 2026). If you work public or institutional work, it earns its cost.

How do I show results when the project lost money?

Say what you did about it. A contingency drawdown you arrested, a claim you settled without litigation, a recovery schedule that pulled 40 days back, a subcontractor default you re-bid in three weeks. Construction people know that jobs go wrong, and a manager who can describe a recovery in numbers reads as more experienced than one whose every project apparently went perfectly.